No. | WORK DESCRIPTION /PROJECT | CLIENT | CONTRACT VALUE (RM) | CONTRACT PERIOD |
---|---|---|---|---|
1. | Cadangan Merekabentuk, Membina dan Menyiapkan 1422 Unit Rumah Berkembar Satu Tingkat Dan Kerja-Kerja Infrastruktur Yang Berkaitan Untuk Penempatan Semula Setinggan Bukit Botak (Taman Selayang Mutiara), Bandar Baru Selayang, Mukim Batu, Daerah Gombak, Kuala Selangor, Selangor Darul Ehsan. | PKNS INFRA BERHAD | 123,500,000.00 | 11.08.10 to 10.05.12 |
2. | Proposed Sungai Buaya Interchange and Toll Plaza | PLUS | 86,550,000.00 | 14.06.2011 |
3. | Menaiktaraf Jalan Muar – Tangkak – Segamat, Johor (Fasa 1 : Segamat – Tangkak) Pakej 1B | JKR | 150,000,000.00 | 01.11.2011 |
No. | WORK DESCRIPTION /PROJECT | CLIENT | CONTRACT VALUE (RM) | CONTRACT PERIOD | DATE COMPLETION |
---|---|---|---|---|---|
1. | Propose design, build, testing commissioning and maintainance of Putra Height interchange and toll plaza at KM 13.2 North South link expressway for sime uep Heights Sdn. Bhd. | PKNS INFRA BERHAD | 61,780,000.00 | 15.03.07 | 09.01.09 |
2. | Kerja-kerja menaiktaraf Tiga(3) Jalan Ladang di Wilayah III, Mada. | DAMAI SETIA SDN. BHD. | 4,943,300.00 | 10.12.08 | 30.04.09 |
3. | Cadangan pembinaan jambatan dari simpang panchor pengkalan Datu, Mukim Panchor, Daerah Kemumin, Kota Bahru, Kelantan. | DAMAI SETIA SDN. BHD. | 9,040,000.00 | 17.02.09 | 31.10.09 |
4. | Construction of roadworks, roadside drain, water reticulation and sewer reticulation (package 4) at proposed intergrated township development of Bandar Bukit Raja (stage 1), Mukim Kapar, Daerah Klang, Selangor Darul Ehsan. | PKNS INFRA BERHAD | 21,945,336.00 | 24.09.08 to 23.12.09 | 23.11.2009 |
5. | Proposed Design and Build of a New Pumping Station and Reticulation Works Including Related Works for the Subang Jaya City Centre (SJCC) Development at Subang Jaya for Sime UEP Centre Sdn Bhd | SIME UEP CENTRE SDN BHD | 11,597,000.00 | 08.04.10 | 15.09.2010 |
6. | Proposed Construction and Completion of Infrastructure Works and TNB Substation At Zone 6A Development Of Nilai impian & Nilai Utama, Mukim Setul, Daerah Seremban, Negeri Sembilan darul Khusus | NEGARA PROPERTIES REALTY SDN BHD | 10,992,200.00 | 24.02.10 to 01.12.10 | 28.11.2010 |
7. | Proposed PavementRehabilitation And Associated Wprks At KM 32.0 – KM 29.7 Southbound, Along Malaysia – Singapura Second Crossing, Section S5 | PLUS | 3,439,300.00 | 14.06.10 to 04.11.10 | 01.11.2010 |
8. | Senai – Pasir Gudang – Desaru Expressway Package 3C/6 (480mm ALTERNATIVE DESIGN PAVEMENT) | RANHILL ENGINEERS AND CONSTRUCTOR SDN BHD | 21,945,336.00 | 09.06.09 to 31.01.11 | 31.01.2011 |
9. | The execution and completion of Mosque for the Asian Institute of Medicine Science and Technology University Mukim Semeling, Daerah Kuala Muda,Kedah Darul Aman. | MIED CAPITAL SDN BHD | 3,889,336.09 | 10.03.10 to 12.01.12 | 30.03.2012 |
10. | Cadang Membina Jalan Keluar Masuk Di KM 18.5 Lebuhraya Persekutuan (Arah Kuala Lumpur)Bandar Glenmarie Daerah Petaling Untuk Bisraya. Sdn Bhd Shell Trading Malaysia Sdn Bhd Dan Bonus Saujana Sdn Bhd | MOHD ASBI & ASSOCIATES | 6,914,820.00 | 05.07.10 to 03.01.11 | 27.03.2012 |
11. | Proposed Bukit Gambir Interchange and Toll Plaza (Phase 1 – Advanced Earthworks) | PLUS | 38,119,920.00 | 12.08.10 to 10.08.11 | 10.02.2012 |